Skip to main content
CTF3

CTF3

Search
OP Home
AD
CTF3
ISOLDE
LEIR
LHC
PS
PSB
SPS
TI
  
Operation Group > CTF3 > Drive Beam (combiner ring injection)  
Drive Beam (combiner ring injection)
Drive Beam (combiner ring injection)
   
View: 
Use SHIFT+ENTER to open the menu (new window).
 Energy
 Ea 184 (28+156) MeV 
 Current
 Ia3.5  A 
 Pulse duration, total
 ta1.4  ms 
 Bunch charge (flat top)
 Qb2.33  nC 
 Number bunches/pulse
 Nb2100 -
 Bunch separation
 Db0.33  ns 
 Bunch length, rms
 sz1.5 - 2.5  mm 
 Energy spread, rms single bunch
 DEsb / Esb ~ 1  % 
 Energy spread, total on flat top
 DE / Eft< 1  %